10.6.2023technical cap. [GWh/d]% (avail./technical cap.) set aside for auctioncontractual unbundled capacity contractual bundled capacit free unbundled capacity / STUIOLI ***) free longterm capacity overnomination
BP - Entry Point Kirevo / Zajecar ****) 366.731 712 40.225 704 0.000 000 326.506 008 0.000 000 40.225 704N/AYES
***) Additional capacity released via CMP procedure. ****) The maximum possible capacity utilization is affected by the shutdown, see the section Firm capacity shutdowns.
Firm Exit capacity
10.6.2023technical cap. [GWh/d]% (avail./technical cap.) set aside for auctioncontractual unbundled capacity contractual bundled capacit free unbundled capacity / STUIOLI ***) free longterm capacity overnomination
BP - Exit Kiskundorozsma 1200 ****) 245.765 592 23.376 576 0.000 000 222.389 016 0.000 000 23.376 576N/AYES
BP - Exit Point Serbia ****) 120.966 144 16.849 152 0.000 000 104.116 992 0.000 000 16.849 152N/AYES
BP - Virtual Compress Station 3.000 000 3.000 000 0.000 000 0.000 000 0.000 000 3.000 000N/ANO
***) Additional capacity released via CMP procedure. ****) The maximum possible capacity utilization is affected by the shutdown, see the section Firm capacity shutdowns.
Interruptible entry capacity
10.6.2023avaiable capacity contractual unbundled capacity
BP - Entry Point Kirevo / Zajecar 366.731 712 0.000 000
Interruptible exit capacity
10.6.2023avaiable capacity contractual unbundled capacity
BP - Exit Kiskundorozsma 1200 245.765 592 0.000 000
BP - Exit Point Serbia 120.966 144 0.000 000
BP - Virtual Compress Station 3.000 000 0.000 000