BP, UGSTechnical capacity [GWh/d]Maximal Planned InterruptionMaximal Unplanned InterruptionMaximum possible usage of technical capacityReal interruption
Zajecar 0.000 000 0.000 000 0.000 000 366.731 712 0.000 000
Exit
BP, UGSTechnical capacity [GWh/d]Maximal Planned InterruptionMaximal Unplanned InterruptionMaximum possible usage of technical capacityReal interruption
Horgoš 0.000 000 0.000 000 0.000 000 245.765 592 0.000 000
Serbia 0.000 000 0.000 000 0.000 000 120.966 144 0.000 000
VCS 0.000 000 0.000 000 0.000 000 3.000 000 0.000 000